We are a manufacturing plant of RSE (Czech Republic).
Direct sale of new gas cogeneration plant RSE 2300 kW on the base engine MWM TCG 3020 V20 (DEUTZ Power Systems, Germany) — the most popular and reliable model of 2024–2026.
In the conditions of modern challenges, speed is of decisive importance. We guarantee the fastest terms of project implementation on the European market. Our installation is the first in its class in terms of speed of installation and commissioning in Ukraine.
Our qualified specialists work on the territory of Ukraine, providing:
- Delivery of equipment.
- Installation and connection.
- Commissioning and testing.
- Preparation of all technical documentation for state and private organizations.
- Service and post-warranty service.
You don't need to worry that the technical part will fall on you - we do everything on a turnkey basis.
Characteristics:
- Electric power — 2000-2300 kW
- Thermal power — 2,214 kW (hot water 90/70 °C) or up to 2,100 kW of steam
- Electrical efficiency — 44.2 %
- The total efficiency is up to 93.8 %
- The resource of the engine before overhaul is 240,000 engine hours
Why exactly from us - the manufacturer:
- The shortest delivery time — 2–4 months (installations are already in production)
- Full a set of accompanying documentation (Euro-1, declarations, certificates of the State Emergency Service and Ecology)
- We have been working successfully in Ukraine for two years already - more 200 RSE installations have been put into operation
- 5-year factory warranty + warehouse of original MWM spare parts in Kyiv
- Turnkey installation in 15-30 days
Ideal for factories, greenhouse plants of 20–50 ha, commercial centers, district thermal power plants and critical infrastructure facilities.
We are open to cooperation and invite potential customers to visit the factory in the Czech Republic to verify the quality of RSE production. Quality confirmed by the manufacturer and EC (European Commission) certificates!
We fix the price and terms of 2026 right now!
Tel.: +380 66 806 03 33 Serhiy Volodymyrovych.
+420 724 311 553 /WhatsApp/Telegram
Email: rse.brno@gmail.com
cogeneration plant 2300 kW, RSE 2.3 MW, MWM TCG 3020 V20, mini thermal power plant 2300 kW buy Ukraine, gas power plant 2 MW












You must Register or Login to post a comment